Green Energy Futures supported a feasibility study for solar panel installation at Highgate Depot. The study focused on maximising solar potential while navigating structural limitations and legacy infrastructure.
The depot site posed significant challenges including asbestos risks, structural degradation, and outdated facility systems—all of which complicated the installation of a modern renewable energy solution.
Green Energy Futures provided strategic consultancy services to guide sustainable decision-making:
Consultancy
Highgate Depot