As London prepared for the introduction of new tube stock on the Piccadilly Line, Green Energy Futures supported the assessment and development of an effective cooling solution for a network where existing systems were failing to cope. The result: an innovative, energy-efficient alternative that significantly outperforms the legacy PAHU (Platform Air Handling Unit) systems.
Rising tunnel temperatures and ageing cooling infrastructure created a major operational challenge for TfL, limiting train throughput and compromising passenger comfort. The existing PAHU systems were underperforming, expensive to maintain, and not future-ready for increased service frequency.
Green Energy Futures led a targeted assessment and solution development process that included:
Outcomes of the trial included:
Consultancy
Trial at Holborn Station